公眾號:mywangxiao
及時發(fā)布考試資訊
分享考試技巧、復(fù)習(xí)經(jīng)驗
新浪微博 @wangxiaocn關(guān)注微博
聯(lián)系方式 400-18-8000
職稱英語考試試題每日一練——《綜合類》 | ||||
The World's Longest Bridge Rumor has it that a legendary six-headed monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily. (1)When completed in 2010, the world's longest bridge will weigh nearly 300,000 tons — equivalent to the iceberg that sank the Titanic — and stretch 5 kilometers long. “That's nearly 50 percent longer than any other bridge ever built,”says structural engineer Shane Rixon. (2) They're suspension bridges, massive structures built to span vast water channels or gorges. A suspension bridge needs just two towers to shoulder the structure's mammoth weight, thanks to hefty supporting cables slung between the towers and anchored firmly in deep pools of cement at each end of the bridge. The Messina Strait Bridge will have two 54,100-ton towers, which will support most of the bridge's load. The beefy cables of the bridge, each 1.2 meter in diameter, will hold up the longest and widest bridge deck ever built. When construction begins on the Messina Strait Bridge in 2005, the first job will be to erect two 370 meter-tall steel towers. (3) Getting these cables up will be something. It's not just their length — totally 5.3 kilometers — but their weight. (4) After lowering vertical“suspender”cables from the main cables, builders will erect a 60 meter-wide 54.630-ton steel roadway, or deck — wide enough to accommodate 12 lanes of traffic. The deck's weight will pull down on the cables with a force of 70,500 tons. In return, the cables yank up against their firmly rooted anchors with a force of 139,000 tons — equivalent to the weight of about 100,000 cars. Those anchors are essential. (5) A Some environmentalists are against the project on biological grounds. B What do the world's longest bridges have in common?考試用書 C If true, one day you might spy the beast while zipping (呼嘯而過) across the Messina Strait Bridge. D They're what will keep the bridge from going anywhere. E The second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individual steel wires. F They will tip up the scales at 166,500 tons — more than half the bridge's total mass. 參考答案:1. C. 2. B. 3. E. 4. F. 5. D | ||||
針對2014年職稱英語考試備考,總有另考生束手無策的疑難問題。例如,對于想?yún)⒓?a title="2014年職稱英語考試" target="_blank" href="http://3swgm8f.cn/zc/" class="blue">2014年職稱英語考試的新考生來說,2014年職稱英語報名條件、職稱英語考試科目等考試信息,你是否想詳細咨詢一下?如果你有意向參加中大網(wǎng)校職稱英語考試培訓(xùn),職稱英語輔導(dǎo)優(yōu)惠方案你是否想了解一下?在聽課過程中,如果你對某一個知識點有疑問等,諸如此類的問題和疑惑,你都可以通過職稱英語考試你問我答平臺,發(fā)起你的疑問,屆時,中大網(wǎng)校職稱英語培訓(xùn)顧問及資深命題專家將在第一時間解答你的疑問。中大網(wǎng)校考試知道,總有人知道你問題的答案,詳情請查看>> | ||||
|
(責(zé)任編輯:wrr)